How Long Does It Take to Remodel a Master Bathroom in Norristown, PA?

Getting an accurate idea about how long a master bathroom remodels takes can help you to figure out how long you will be without one of your bathrooms. Especially if you only have two bathrooms in the entire home, the master bathroom going out for a remodel can throw your life into chaos and inconvenience.

How Long Does the Average Master Bathroom Remodel Take?

You can expect a master bathroom remodel to take anywhere from four to six weeks. While this gives you the average estimate, no contractor can give you an exact date because multiple factors can delay a remodeling project. Most of the time, you can expect problems to arise. It comes with the territory.

How long your bathroom remodeling project takes will depend on multiple factors:

  • Technical failures
  • Workers calling in sick
  • Workers injured on the job
  • Logistical delays
  • Delays with signing the permit
  • Weather delays
  • Pre-existing home conditions

Even small changes to your project can shift the whole project with how you complete it. Unexpected circumstances can arise where a project that might have taken 23 days suddenly doubles to 46 days.

What is the Scale of the Master Bathroom Remodel?

Ask yourself, “Will I do a simple cosmetic remodel or strip the bathroom to the studs?” Simple bathroom remodels may require as little as a few days, but if you plan to undertake a big remodeling project, you can expect it to take much longer. Next, consider if you will hire a contractor or take the remodeling on as a DIY project. The DIY route can take much longer because you do all the work yourself instead of an expert working with subcontractors to complete the work.

If you choose to remodel the project by yourself, a 15-day timeline can, in fact, wind up taking two to three months before you complete it. It does cost less than hiring contractors, however, but you should know what to expect.

You need to think about the materials and their availability. Are all the materials available, or will you need to wait for delivery? Ceramic tiles, for example, have an infamous reputation for holding back projects by several weeks, so you want to understand the landscape of the materials you need before you take it on and order ahead of time.

Understanding the Phases of a Bathroom Remodeling

Let’s break down a master bathroom remodel and look at the estimated time that each phase takes.

Demolition

Depending on the scale of the project, demolition usually takes anywhere from two to five days. You can expect to pay anywhere from $500 to $2,000 for this phase, and the cost and how long it takes will look at what you need to remove. For example, removing the walls is common, and it usually costs anywhere from $90 to $120. During this phase, you install the structural beams and new windows.

Plumbing Rough-Ins

You can expect this part of the project to take one to four days. This averages most homeowners $2,250 and depends on the number and types of fixtures.

Rough Carpentry

The rough carpentry phase requires takes about two days, and the average cost is around $7,000.

Tiling Preparations

This usually costs you anywhere from $4 to $115 per square foot, depending on the materials, and it will take anywhere from one to three days.

Sheeting

You can expect sheeting to take anywhere from one to two days.

Waterproofing

Waterproofing inside of a bathroom does matter, and it usually takes two to four days to make the bathroom ready for future use.

Tiling

Tiling in the bathroom takes anywhere from five to seven days when you cut them out and install them on the floors and walls.

Tile Finishing

Putting the finishing on the tiling like getting the critical joints grouted and silicone will usually take one to three days.

Painting

You can expect painting the bathroom to take two to five days. This is also the part where you touch it up to give it a fresh look. How long it takes depends on the size of the bathroom and how many people you hired to help paint.

Vanity and Countertops

This phase of the project requires three to five days depending on how many counters you need. Google “Granite companies nearby” in Norristown, Pennsylvania, to shorten the time it takes to get the materials from a local and trusted company.

Installing Fixtures

Getting fixtures installed will take anywhere from two to four days, and you will use this time to install sinks, toilets, taps, and bathtubs. How long it takes depends on the scale of your project with more fixtures requiring more time.

Details and Adjustments

You can expect the details and adjustments to take anywhere from two to four days. You’d think of this part as the miscellaneous work that helps you to put the finishing touches on the bathroom. This helps you to get it ready for use.

Final Thoughts

If you’re looking for a variety of stone choices for your master bathroom remodeling project, speak with Marble Concepts. Since 1991, we have served the Norristown, Pennsylvania, region, and we can help you to get the materials for your remodeling project. If you’d like to learn more, give us a call today at 215-396-7393.